
Rubber PowEPTMaking Line comma Used Tyre Recycling Plant 500kg solHour
1 period One Hook DebeaEPTLSJ-1200
Structural functions
The blade of cutter is manufactured of alloy welding and the area is tough dress in-resisting time period
On basic safety aspect comma this EPT have protective frame comma which can effectively guarantee basic safety in the approach of pulling out wire loop interval
Motor and EPT comma and as a EPT comma the construction is compact interval
The EPT occupies the EPT flooring comma practical set up period of time
Use colon
Pulling out the wire loops from the mouth of waste tires period
2 period Tire Cutter QDJ-1200
The fundamental basic principle is colon motor drives hydraulic program and the cylinder comma place the tire to lock arm comma fasten two blades rotating between tire and shear cylinders function to move comma two blades rotating blades forming shear comma attain the impact of shear interval
Characteristic colon
This gear comma great shear result comma shearing velocity comma reduced strength use comma modest quantity comma convenient comma simply because use the hydraulic system comma effortless procedure and protected interval
Mechanical description colon the tires far more than 800 want to reduce comma and cut into 4 pieces in EPT periodthe size of piece is 200-500mm period
Notes for making use of tire cutter colon
a interval Examine the knives regularly comma if look evident blunt comma it must be sustain well timed comma and the service is 2-3 years period
b interval the oil in hydraulic station ought to be filtered and transformed regularly interval EPTly filter as soon as each one and 50 percent 12 months period of time
c interval Putting on areas colon rubber seals comma shipped with yet another set when ship the EPT to the consumer interval
three amp4 period of time EPT tire shredEPTZPS-900
Use colon
This EPT can directly crush tires smaller sized than 800mm tires time period At the EPT temperature comma can be set right crushed into fifty ast 50 mm block comma so the next rotating can grind into 10-thirty meshes or wire and fiber separation products period of time
Feature colon
This EPT is a compact construction comma innovative technologies comma low power usage comma higher efficiency comma smashing off the take a look at space for the construction comma maintenance is notably convenient semi instruments with carbide surfacing engineering comma higher hardness comma large use resistance comma and repeated repair making use of comma so has a EPTer services daily life semi rotary display for the lattice composition of steel mesh comma blanking massive location comma enabling the screening of certified rubber interval Right after the partition of large tires can obtain the effect of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can immediately be damaged into fifty ast50 mm of rubber block time period
Notes for making use of EPT tire shredder colon
a interval Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma principal bearings use calcium-dependent grease lubrication comma a few months after the operation of the EPT comma the oil ought to be replaced and clean the fuel tank period of time Given that then modify the oil when time each year period of time
b Soon after offer with three comma000 tons of waste rubber lparin standard circumstances rpar commathe consumer need to grind the blade slicing edge after time time period The blades is the put on elements comma the EPT services lifestyle is five-six years comma when providing the EPT to the customer comma the shredEPTwill be equipped with edge hardness layer patching substance lparelectrodes rpar period of time
5 period Double Rolls Rubber Crusher XKP-560
Use colon
Mostly utilized for crack huge rubber blocks into 40-50mm small rubber blocks time period
Complex parameters colon
Framework colon The rollers undertake alloy cold difficult forged irons with put on-resisting comma tough people period The mill flour is with tooth comma large groove period
In orEPTto extend the services existence of the cracker comma we suggest construct foundations for rubber cracker interval
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and difficult equipment floor EPT with reduce sound and EPTer services existence period
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great operating platforms comma all the wires will be linked nicely from managing system to motor time period When using the EPT comma the customers just need to connect directly to the EPT period of time
squander tyre recycling equipment comma Waste tire recycling EPT
| No interval | Identify | Product | Qty period lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | One hook debeader | LSJ-1200 | 1 | eleven | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | 5 period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
| 6 | Big conveyor gear | BCL-eight | one | 2 | ||
| 7 | Modest conveyor tools | BCL-3 | 1 | 1 period1 | ||
| 8 | Large Magnet separator | BMS22 | one | two period2 | ||
| nine | Tiny Magnet separator | SMS-one | 1 | 1 period1 | ||
| 10 | Massive Shaking monitor | BSS-eight | 1 | 7 period5 | ||
| 11 | Little Shaking display screen | SSS-3 | 1 | 3 | ||
| 12 | Fiber separator | FS110 | one | 5 period5 | ||
| 13 | Wonderful Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Sq. vibrating sieve | 600 | one | ||||
| Rubber powder collector | JFS500 | 1 | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | one period5cbm | one | ||||
| Hopper | 1 | |||||
| Belt conveyer | one | period75 | ||||
| 14 | Steel Baller EPT | 30T | one | seven period5 | ||
| fifteen | Rubber powder EPT EPT | one | three | |||
| 24 | 334 period4KW | |||||
Rubber PowEPTMaking Line comma Employed Tyre Recycling Plant

