
1 time period Material colon Galvanized Metal
2 interval Software colon Dry wall Partition and Suspension Program
We can produce all measurement in accordance consumers need period of time
Specification colon
Track colon
Width colon 52mm sol72mm sol75mm sol100mm sol148mm
Top colon 25mm sol29mm sol32mm sol40mm
Thickness colon period40 to 1 period0mm
StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd length colon 3000mm
Stud colon
Width colon 50mm sol70mm sol73mm sol98mm sol146mm
Peak colon 32mm sol34 period5mm sol36mm
Thickness colon period40 to 1 period0mm
StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd duration colon 3000mm
Omega lparFurring channel rpar colon 35 ast22mm sol 45 ast22mm sol 35 ast16mm
Wall Angle colon twenty ast20mm sol22 ast22mm sol25 ast25mm
Main Channel colon 38 ast11mm sol50 ast15mm sol60 ast27mm
CD amp UD Program C ampD 60 ast27 comma 27 ast 28mm comma
Advantage colon
Exceptional fire resistive capability period of time Fit residuals and community places time period
Fast installation period Easy to control the construction development
Combinative design period of time Easy to hold operate areas thoroughly clean time period
Good vibration absorbing ability time period Go well with properties on seismic belt interval
Fast reconstruction for simple assembling and dismantling interval
Filling acoustic insulation can improve the sound-evidence potential interval
Surface of the walls are sleek time period Effortless to paint or paste wallpaper period of time
Electric wires are concealed in the wall
It is easy to drill by means of the wall for construction interval
It could be utilized unEPTthe original ceiling
| Merchandise name | Metallic Steel Main Channel for Suspended Ceiling Technique |
| Merchandise Style | Layout personalization comma in accordance to consumers drawings or pictures period |
| Services | We can provide comprehensive services for you with expert manufacturing comma revenue comma shipping and delivery and soon after-provider group time period |

