
Waste Tyre Recycling EPT comma Employed Tyre Recycling Plant 500kg solHour
one time period Solitary Hook DebeaEPTLSJ-1200
Structural characteristics
The blade of cutter is manufactured of alloy welding and the surface is hard wear-resisting period
On basic safety factor comma this EPT have protecting body comma which can successfully assure security in the process of pulling out wire loop interval
Motor and EPT comma and as a EPT comma the framework is compact interval
The EPT occupies the EPT ground comma hassle-free installation period
Use colon
Pulling out the wire loops from the mouth of squander tires time period
2 interval Tire Cutter QDJ-1200
The basic basic principle is colon motor drives hydraulic program and the cylinder comma place the tire to lock arm comma fasten two blades rotating in between tire and shear cylinders function to transfer comma two blades rotating blades forming shear comma accomplish the impact of shear interval
Feature colon
This tools comma very good shear result comma shearing speed comma minimal power usage comma little quantity comma practical comma due to the fact use the hydraulic program comma straightforward operation and protected time period
Mechanical description colon the tires much more than 800 need to reduce comma and reduce into 4 pieces in EPT periodthe dimensions of piece is two hundred-500mm period
Notes for employing tire cutter colon
a interval Inspect the knives usually comma if look evident blunt comma it need to be keep well timed comma and the service is 2-three many years period of time
b period the oil in hydraulic station should be filtered and changed often interval EPTly filter once every single one particular and fifty percent yr period of time
c interval Putting on parts colon rubber seals comma sent with yet another set when ship the EPT to the consumer period of time
3 amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can directly crush tires smaller sized than 800mm tires interval At the EPT temperature comma can be put straight crushed into 50 ast 50 mm block comma so the following rotating can grind into ten-thirty meshes or wire and fiber separation tools period
Feature colon
This EPT is a compact composition comma sophisticated technology comma low strength consumption comma substantial effectiveness comma smashing off the examination room for the structure comma routine maintenance is notably practical semi resources with carbide surfacing technology comma substantial hardness comma higher put on resistance comma and recurring fix making use of comma so has a EPTer provider life semi rotary monitor for the lattice composition of steel mesh comma blanking big spot comma enabling the screening of certified rubber time period After the partition of big tires can obtain the influence of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be damaged into 50 ast50 mm of rubber block period
Notes for employing EPT tire shredder colon
a period Inject gear oil into EPT oil lparhypoid gear oil rpar comma main bearings use calcium-based mostly grease lubrication comma a few months following the operation of the EPT comma the oil need to be replaced and clear the gasoline tank interval Since then alter the oil after time each and every yr interval
b After offer with 3 comma000 tons of waste rubber lparin typical situation rpar commathe buyer should grind the blade slicing edge after time interval The blades is the wear areas comma the EPT service existence is five-six many years comma when offering the EPT to the customer comma the shredEPTwill be geared up with edge hardness layer patching substance lparelectrodes rpar period of time
five period of time Double Rolls Rubber Crusher XKP-560
Use colon
Mostly utilized for crack big rubber blocks into forty-50mm little rubber blocks period
Specialized parameters colon
Construction colon The rollers undertake alloy chilly difficult forged irons with wear-resisting comma resilient people time period The mill flour is with teeth comma high groove time period
In orEPTto increase the service lifestyle of the cracker comma we advise build foundations for rubber cracker period of time
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and challenging gear floor EPT with reduce noise and EPTer service daily life period
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful running platforms comma all the wires will be related properly from controlling technique to motor time period When employing the EPT comma the buyers just need to have to link directly to the EPT period
Waste Tyre Recycling EPT comma Utilised Tyre Recycling Plant
| No time period | Identify | Model | Qty interval lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | Solitary hook debeader | LSJ-1200 | one | eleven | ||
| two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | 1 | 90 | ||
| 6 | Big conveyor gear | BCL-8 | 1 | two | ||
| 7 | Modest conveyor equipment | BCL-3 | one | 1 period1 | ||
| 8 | Massive Magnet separator | BMS22 | one | 2 period2 | ||
| 9 | Modest Magnet separator | SMS-1 | 1 | one period1 | ||
| ten | Big Shaking display screen | BSS-eight | one | 7 period5 | ||
| 11 | Little Shaking display | SSS-3 | 1 | 3 | ||
| twelve | Fiber separator | FS110 | 1 | five period5 | ||
| thirteen | Fine Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Square vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | 1 | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | one | period75 | |||
| Screw conveyer | Phi132mm | one | period75 | |||
| Storage pin | 1 period5cbm | 1 | ||||
| Hopper | 1 | |||||
| Belt conveyer | one | period75 | ||||
| 14 | Steel Baller EPT | 30T | 1 | seven period5 | ||
| 15 | Rubber powder EPT EPT | 1 | three | |||
| 24 | 334 period4KW | |||||
Waste Tyre Recycling EPT comma Utilised Tyre Recycling Plant

